Drawing of clinker bulk loader
Darko's clinker bulk loader is an efficient and reliable equipment designed specifically for clinker loading in the cement industry.
The clinker bulk loader is a device that automatically transports clinker from the warehouse to clinker bulk trucks and ships.
The clinker bulk loader at the bottom of the warehouse is mainly composed of manual rod valves, electric (electro-hydraulic or pneumatic) fan valves, winches, telescopic unloading devices, dust collection hoses, capacitive limit switches, electronic control systems, etc.
Technical Data Sheet
Technical performance | Technical Parameters | ||
Conveying materials | Cement clinker or similar bulk materials | ||
Material capacity | Clinker 1.45t/m³ | ||
Material temperature | ≤150℃ | ||
Material particle size | ≤50mm | ||
Loading capacity | ≤300t/h | ||
Discharge head telescopic distance | Customized according to user requirements | ||
Manual stick valve | 790mm×790mm | 410mm×410mm | |
Electric (pneumatic) sector valve | DZG1103
2×1.1KW |
Electro-hydraulic push rod: DTY700-400/100
1.5KW (cylinder: QGB125×400-MP4) |
|
Hoist | CD1-18D Power: 3KW Lifting speed: 8M/S | ||
Capacitive (tuning fork) limit switch | FTC131 probe specifications: φ25×400 Working pressure: 10bar
Working temperature: -20℃~80℃ FTM31 probe specifications: φ20×230 lengthened 170mm Working pressure: 10bar |
||
Installed power | ~5.2KW | ~4.5KW ( ~3KW) | |
Reference drawing | SZT300-I/1 | SZT300- Ⅱ/2 | SSQ300-Ⅲ |
Model | Kudi | Kudi | Side of warehouse |
Working principle
When the transport vehicle enters the loading position, open the rod valve corresponding to the number of rods.
Press and hold the "lowering button" of the control cabinet. After the unloading head is in place, the system will automatically disconnect the power of the elevator.
Press the "loading button" to enter the unloading state. Then the auxiliary equipment will start working accordingly. The dust generated by unloading will pass through the unloading hopper.
The telescopic dust collection hose enters the dust collector for purification. When the material in the lower head is full, the lower head will rise while alarming.
The operator must set the rising distance before loading. If the rising distance is 1 meter, set the time relay accordingly. Adjust to T=1/V.
During the rising process, charging is always in progress. When the material is full, repeat the above work. After reaching the full position, press the stop button to reversely brake the electric vibrator, or close the sector valve to stop discharging.
After parking, you can press the up button to keep the lower hopper away from the material at a certain distance to ensure the displacement of the transportation tool, and then align it with the second unloading station. until the entire silo is filled.